The Georgia Department of Transportation released the following updated schedule of lane closures for I-285 and I-20 for the I-285/I-20 West Interchange project beginning Monday, December 1, and continuing through Friday, November 5:
Weather permitting, the Georgia Department of Transportation (Georgia DOT) contractors will temporarily close interstate lanes for the I-285/I-20 West Interchange project. This project will reconstruct and widen several interstate system-to-system ramps at the I-285/I-20 West Interchange and add a combination of collector-distributor lanes or connecting lanes, and auxiliary lanes along I-20 west and I-285 north of the interchange.
Lane Closures
| Roadway | Activity | Start Date | End Date | Times |
| I-285 Northbound | ||||
| Cascade Road to Bolton Road | Single, right-lane, and right-shoulder closure | Monday, December 1 | Friday, December 5 | 9 p.m. – 5 a.m. Nightly |
| Cascade Road to Bolton Road | Double, right-lane, and right-shoulder closure | Monday, December 1 | Friday, December 5 | 11 p.m. – 5 a.m. Nightly |
| I-285 Southbound | ||||
| US 78/Donald Lee Hollowell Pkwy to SR 139/MLK Jr. Drive | Single, right-lane, and right-shoulder closure | Monday, December 1 | Friday, December 5 | 9 p.m. – 5 a.m. Nightly |
| US 78/Donald Lee Hollowell Pkwy to SR 139/MLK Jr. Drive | Alternating, double, right-lane, and right-shoulder closure, and double, left-lane, and left-shoulder closure | Monday, December 1 | Friday, December 5 | 11 p.m. – 5 a.m. Nightly |
| SR 280/South Cobb Drive to I-20 Interchange | Pacing operation, all lanes and shoulders | Tuesday, December 2 | Thursday, December 4 | 10:30 a.m. – 12 p.m. Daily |
| I-20 Westbound | ||||
| Anderson Avenue underpass to Riverside Parkway | Single, right-lane, and right-shoulder closure | Monday, December 1 | Friday, December 5 | 9 p.m. – 5 a.m. Nightly |
| SR 139/MLK Jr. Drive to the Interchange | Pacing operation, all lanes and shoulders | Tuesday, December 2 | Thursday, December 4 | 10:30 a.m. – 12 p.m. Daily |
| I-20 Eastbound | ||||
| Riverside Parkway to the I-285 Interchange | Alternating, single, right-lane, and right-shoulder, and single, left-lane, and left-shoulder closure | Monday, December 1 | Friday, December 5 | 9p.m. – 5 a.m. Nightly |
| Other Locations | ||||
| SR 70/Fulton Industrial Boulevard SB from Wendell Drive to Shirley Drive | Single, right-lane, and right-shoulder closure | Monday, December 1 | Friday, December 5 | 8 p.m. – 5 a.m. Nightly |
| SR 139/MLK Jr. Drive NB from Old Gordon Road to Adamsville Drive | Single, right-lane, and right-shoulder closure | Monday, December 1 | Friday, December 5 | 8 p.m. – 5 a.m. Nightly |
| Collier Drive from Harwell Road to Collier Court | Flagging operation | Monday, December 1 | Friday, December 5 | 8p.m. – 5 a.m. Nightly |
| Delmar Lane from Arlington Drive to Harwell Road | Flagging operation | Monday, December 1 | Friday, December 5 | 8 p.m. – 5 a.m. Nightly |
| Harwell Road from Collier Drive to Amhurst Drive | Flagging operation | Monday, December 1 | Friday, December 5 | 8 p.m. – 5 a.m. Nightly |
Advisory: Exact time may change due to weather conditions. There may be intermittent traffic pacing and lane and ramp closures that occur within the work zone in addition to this notice. Motorists are advised to expect delays, exercise caution, and reduce their speed while traveling through work zones, stay alert, and watch for workers. Before heading out, get real-time information on work status and traffic conditions. Call 511, visit 511ga.org, or download the Georgia 511 app.
For additional project information, visit https://0013918-gdot.hub.arcgis.com/.

Be the first to comment on "GDOT releases updated schedule of lane closures for I-285 and I-20 in Cobb and Fulton beginning Dec 1"