GDOT Releases Weekly I-285 and I-20 Lane Closure Schedule for the West Interchange Project in Cobb & Fulton

Interstate 20 and 285 shields are overlaid on a drawing of an interstate highway interchange

The Georgia Department of Transportation released the following updated schedule of lane closures for I-285 and I-20 for the estimated $1.2 billion I-285/I-20 West Interchange project.

This week’s updated schedule begins Monday, March 30, and continues through Sunday, April 5:

Weather permitting, the Georgia Department of Transportation (Georgia DOT) contractors will temporarily close interstate lanes for the I-285/I-20 West Interchange project. This project will reconstruct and widen several interstate system-to-system ramps at the I-285/I-20 West Interchange and add a combination of collector-distributor lanes or connecting lanes, and auxiliary lanes along I-20 west and I-285 north of the interchange.

Lane Closures

RoadwayActivityStart DateEnd DateTimes
285 Northbound
Cascade Road to Bolton RoadSingle, right-lane, and right-shoulder closureMonday, March 30 Saturday, April 49 p.m. – 5 a.m. Nightly
Cascade Road to Bolton RoadDouble, right-lane, and right-shoulder closureMonday, March 30 Saturday, April 411 p.m. – 5 a.m.
Nightly
I-285 Southbound
US 78/Donald Lee Hollowell Pkwy to SR 139/MLK Jr. DriveAlternating, single, right-lane, and right-shoulder closure, and single, left-lane, and left-shoulder closureMonday, March 30 Saturday, April 49 p.m. – 5 a.m.
Nightly
US 78/Donald Lee Hollowell Pkwy to SR 139/MLK Jr. DriveAlternating, double, right-lane, and right-shoulder closure, and double, left-lane, and left-shoulder closureMonday, March 30 Saturday, April 411 p.m. – 5 a.m.
Nightly
SR 280/South Cobb Drive to the I-20 InterchangePacing operation, all lanes and shouldersMonday, March 30Thursday, April 210:30 a.m. – 12 p.m. Daily
I-20 Westbound
Anderson Avenue underpass to Riverside ParkwaySingle, left-lane, and left-shoulder closureMonday, March 30 Tuesday, March 319 p.m. – 5 a.m. Overnight
Anderson Avenue underpass to Riverside ParkwayDouble, left-lane, and left-shoulder closureMonday, March 30 Saturday, April 411 p.m. – 5 a.m. Nightly
SR 139/MLK Jr. Drive to the I-285 InterchangePacing operation, all lanes and shouldersMonday, March 30 Thursday, April 210:30 a.m. – 12 p.m. Daily
I-20 Eastbound
Riverside Parkway to the I-285 InterchangeSingle, right-lane, and right-shoulder closureMonday, March 30 Saturday, April 49 p.m. – 5 a.m.
Nightly
Riverside Parkway to the I-285 InterchangeDouble, right-lane, and right-shoulder closureMonday, March 30 Friday, April 311 p.m. – 5 a.m.
Nightly
Other Locations
SR 70/Fulton Industrial Boulevard SB from Wendell Drive to Shirley Drive              Single, right-lane, and right-shoulder closureMonday, March 30 Saturday, April 48 p.m. – 5 a.m.
Nightly
SR 139/MLK Jr. Drive NB from Old Gordon Road to Adamsville DriveSingle, right-lane, and right-shoulder closureMonday, March 30 Saturday, April 48 p.m. – 5 a.m.
Nightly
ADVANCE NOTICE & DETOURS
 I-20 Eastbound to I-285 Northbound ramp closure
Overnight closure and detour (Map)
Motorists traveling on I-20 eastbound will exit onto I-285 southbound, continue straight onto to SR 139/Martin Luther King Jr. Drive (Exit 9), then turn right to exit onto the loop ramp to I-285 northbound
Monday, March 30Friday, April 39 p.m. until 5 a.m.
Nightly
I-285 Northbound to I-20 Westbound ramp closure
Overnight closure and detour (Map)
Motorists traveling on I-285 northbound will continue to US 78/Donald Lee Hollowell Pkwy (Exit 12), turn left, enter to I-285 southbound, and then exit onto I-20 westbound  (Exit 10B)
Friday, April 3Saturday, April 49 p.m. until 5 a.m.
Overnight
I-285 Northbound to I-20 Eastbound ramp closure
Overnight closure and detour (Map)
Motorists traveling on I-285 northbound will exit onto US 78/Donald Lee Hollowell Pkwy (Exit 12), turn left to go over the bridge, then turn left onto I-285 southbound, and then exit onto I-20 eastbound
Thursday, April 9Tuesday, April 149 p.m. until 5 a.m.
Nightly
I-285 Southbound to I-20 Eastbound ramp closure
Overnight closure and detour (Map)
Motorists traveling on I-285 southbound will exit onto SR 139/Martin Luther King Jr. Drive (Exit 9), then turn right to get on the loop ramp to I-285 northbound, and then exit onto I-20 eastbound
Thursday, April 9Tuesday, April 149 p.m. until 5 a.m.
Nightly

NOTE: The listed detours will be scheduled so they will not conflict with one another. Closures and detours will be coordinated to ensure proper maintenance of traffic. No more than one ramp in the I-285/I-20 West Interchange will be closed at a time.

Advisory: Exact time may change due to weather conditions. There may be intermittent traffic pacing and lane and ramp closures that occur within the work zone in addition to this notice. Motorists are advised to expect delays, exercise caution, and reduce their speed while traveling through work zones, stay alert, and watch for workers. Before heading out, get real-time information on work status and traffic conditions. Call 511, visit 511ga.org, or download the Georgia 511 app.
 
For additional project information, visit https://0013918-gdot.hub.arcgis.com/.